AN ACT relative to electric renewable energy classes.
SPONSORS: Rep. Murotake, Hills 32; Rep. Flanagan, Hills 26; Rep. Eastman, Hills 28; Rep. Seidel, Hills 28; Sen. Avard, Dist 12
COMMITTEE: Science, Technology and Energy
This bill adds hydroelectric to Class I renewable energy sources.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Explanation: Matter added to current law appears in bold italics.
Matter removed from current law appears [in brackets and struckthrough.]
Matter which is either (a) all new or (b) repealed and reenacted appears in regular type.
15-0092
06/09
STATE OF NEW HAMPSHIRE
In the Year of Our Lord Two Thousand Fifteen
AN ACT relative to electric renewable energy classes.
Be it Enacted by the Senate and House of Representatives in General Court convened:
1 Electric Renewable Energy Classes. Amend RSA 362-F:4, I to read as follows:
I. Class I (New) shall include the production of electricity or useful thermal energy from any of the following, provided the source began operation after January 1, 2006, except as noted below:
(a) Wind energy.
(b) Geothermal energy, if the geothermal energy output is in the form of useful thermal energy only if the unit began operation after January 1, 2013.
(c) Hydrogen derived from biomass fuels or methane gas.
(d) Ocean thermal, wave, current, or tidal energy.
(e) Methane gas.
(f) Eligible biomass technologies.
(g) Solar thermal energy; if the solar thermal energy output is in the form of useful thermal energy only if the unit began operation after January 1, 2013.
(h) Class II sources to the extent that they are not otherwise used to satisfy the minimum portfolio standards of other classes.
(i) The incremental new production of electricity in any year from an eligible biomass or methane source or any hydroelectric generating facility licensed or exempted by Federal Energy Regulatory Commission (FERC), regardless of gross nameplate capacity, over its historical generation baseline, provided the commission certifies demonstrable completion of capital investments attributable to the efficiency improvements, additions of capacity, or increased renewable energy output that are sufficient to, were intended to, and can be demonstrated to increase annual renewable electricity output. The determination of incremental production shall not be based on any operational changes at such facility but rather on capital investments in efficiency improvements or additions of capacity.
(j) Hydroelectric.
[(j)] (k) The production of electricity from a class III or IV source that has begun operation as a new facility by demonstrating that 80 percent of its resulting tax basis of the source’s plant and equipment, but not its property and intangible assets, is derived from capital investment directly related to restoring generation or increasing capacity including department permitting requirements for new plants. Such production shall not qualify for class III or IV certificates. Commencing July 1, 2013, a class III source eligible as a class I source under this subparagraph or subparagraph (i) may submit a notice to the commission electing to be a class III source instead of a class I source. Once such notice is given, the production from such a source shall qualify for class III certificates, provided the source meets the other requirements of a class III eligible biomass technology.
[(k)] (l) The production of electricity from any fossil-fueled generating facility that originally commenced operation prior to January 1, 2006, if after January 1, 2012 such facility co-fires with class I eligible biomass fuels to displace the combustion of an amount of fossil fuels. The portion of the total electrical energy output that qualifies as class I from a facility in a given time period shall be the fraction of electrical production derived from the combustion of biomass fuels based on the heat input at the facility in that time period as determined by the commission in consultation with the department. To qualify under this paragraph, the electricity generation facility that co-fires with biomass fuels shall:
(1) Either have a quarterly average nitrogen oxide (NOx) emission rate, as measured and verified under RSA 362-F:12, of less than or equal to 0.075 pounds/million British thermal units (lbs/Mmbtu) or be a participant in a plan approved by the department for reductions in NOx from other emission sources. The quantity of reductions required shall be the fraction of electrical production derived from the combustion of biomass fuels, as determined under this paragraph, multiplied by the difference between the generation unit’s NOx emissions rate and the 0.075 lbs/Mmbtu rate. The plan shall contain reductions, in the aggregate or individually, in NOx emissions from other emission sources under the jurisdiction of the department and demonstrate that the reductions will be quantifiable. The department shall expeditiously review the plan and, if approved, provide such information as it deems relevant to the commission. The application submitted to the commission under RSA 362-F:11 shall inform the commission of the plan and the commission shall certify the source in accordance with the plan approved by the department; and
(2) Either have an average particulate emission rate, as measured and verified under RSA 362-F:12, of less than or equal to 0.02 lbs/Mmbtu or be a participant in a plan approved by the department for reductions in particulate matter emissions from emission sources owned by or affiliated with the co-firing entity. The quantity of reductions required shall be the fraction of electrical production derived from the combustion of biomass fuels, as determined under this paragraph, multiplied by the difference between the generation unit’s particulate matter emissions rate and the 0.02 lbs/Mmbtu rate. The plan shall contain reductions, in the aggregate or individually, in particulate matter emissions from other emission sources under the jurisdiction of the department and demonstrate that the reductions will be quantifiable. The department shall expeditiously review the plan and, if approved, provide such information as it deems relevant to the commission. The application submitted to the commission under RSA 362-F:11 shall inform the commission of the plan and the commission shall certify the source in accordance with the plan approved by the department.
[(l)] (m) Biomass renewable energy technologies producing useful thermal energy that began operation after January 1, 2013 provided that:
(1) If the unit is a biomass unit rated between 3 and 30 Mmbtu/hr design gross heat input, it shall have an average particulate emission rate of less than or equal to 0.10 lbs/Mmbtu as measured and verified by conducting and reporting the results of a one-time initial stack test in accordance with methods approved by the department;
(2) If the unit is a biomass unit rated equal to or greater than 30 Mmbtu/hr design gross heat input, it shall have an average particulate emission rate of less than or equal to 0.02 lbs/Mmbtu as measured and verified under RSA 362-F:12;
(3) If the unit is a biomass unit rated less than 100 Mmbtu/hr design gross heat input, best management practices as determined by the department shall be implemented; and
(4) If the unit is a biomass unit rated equal to or greater than 100 Mmbtu/hr design gross heat input, it shall have a quarterly average NOx emission rate of less than or equal to 0.075 Mmbtu/hr as measured and verified under RSA 362-F:12; and
(5) If the unit is an upgrade or replacement to an existing source of thermal energy that used biomass as its primary fuel source in its normal operation prior to January 1, 2013, then the unit shall be a combined heat and power unit that provides district heating, and at least 80 percent of the resulting tax basis of the unit’s plant and equipment, but not its property and intangible assets, shall be derived from capital investments directly related to the upgrade or replacement and made on or after January 1, 2013.
2 Effective Date. This act shall take effect 60 days after its passage.